A parallel run checklist reduces switching risk by having you operate the legacy and new planning platforms side by side, reconcile outputs against tolerances you set in advance, complete user acceptance testing with documented sign-off, and meet formal cutover criteria before you retire the old system. Use the phases below, each with an owner, evidence and an exit condition.
Key takeaways
Agree the end condition for the parallel run before it starts.
Freeze a baseline so both platforms compare the same data.
Reconcile to tolerances you set in advance, and log every difference.
Run UAT with the people who will use the platform, then collect written sign-off.
Phase 1: Decide whether you need a parallel run
A parallel run fits almost any move where board reporting, audit readiness or close timing cannot tolerate gaps. It matters most when you have complex allocations, multi-currency consolidation or intercompany logic.
Document which outputs need parallel validation.
Set the minimum number of planning cycles to run.
Owner: senior FP&A lead, with sign-off from the Controller.
Phase 2: Freeze a baseline
Freeze legacy data at an agreed date.
Load the same baseline into the new platform.
Confirm mappings for accounts, entities and departments.
Evidence: baseline reconciliation report.
Phase 3: Run in parallel and reconcile
Check | What to compare | Evidence |
|---|---|---|
Actuals | Totals by account, entity and period against the general ledger | Reconciliation log |
Budget and forecast | Same inputs, same outputs in both systems | Side-by-side report |
Scenarios | Leadership's top scenarios in both systems | Scenario comparison |
Headcount and cost | Roster and compensation to plan | Variance review |
Board reporting | Key figures in the board pack | Tie-out |
Agree tolerances before the run.
Log every difference with its cause and resolution.
Repeat until differences are explained and within tolerance.
Phase 4: User acceptance testing
Write test scripts around real tasks: submit a budget, approve a change, run a scenario, produce a board view.
Include budget owners and approvers, not only model builders.
Record pass or fail for each script, with a named tester.
Fix defects and retest.
Phase 5: Cutover criteria and sign-off
Reconciliations pass within tolerance.
UAT scripts pass.
Integrations refresh correctly.
Approval workflows work with real approvers.
The Controller and VP Finance sign off in writing.
Keep the legacy system read-only until the first cycle on the new platform closes.
How Abacum supports a parallel run
Abacum is the AI-native FP&A platform finance trusts, and the business planning platform the whole company runs on. It runs on one governed layer of data, logic and context: data is the what, logic is the how, context is the why.
Budget owners plan in their own spaces with input templates, while finance keeps control of approvals and the final number.
Versions let you compare plan states side by side, and every change to a reported figure is proposed, reviewed and approved before it saves.
AI Modeler turns a plain-language description, or a spreadsheet you have already built, into a working model in minutes. You can add a product line or new variables by asking, even in models you inherited, and every model explains itself line by line before the board meeting. The agent proposes, our planning engine calculates, and you approve. Nothing saves until you approve.
Abra, the AI agent at the center of Abacum, takes a question in plain language, works out what it needs, and brings in the right expert agents (Modeler, Analyst, Reporter and Data Manager). It works from your governed data, models and context, every answer shows its work, and nothing changes without approval.
Every answer links back to its source data and assumptions, which speeds up tie-outs during reconciliation.
Read our guide to the FP&A software rollout plan with 7 testing steps, and our FP&A replatforming plan with strong data governance for the ownership side of cutover.